Location: | Pueblo, CO | |
Owner: | CSU-Pueblo | |
Architect: |
| |
General Contractor: | Hall-Irwin Corporation | |
Construction Period: | Dec 2006 - Apr 2007 | |
LEED® Rating: | Not Applicable | |
Description: | This project consisted of design and construction of a new multi-purpose field to provide a permanent home for intramural and club sports programs as well as other recreational uses. Project included construction of a new synthetic turf field located next to the existing CSU-Pueblo Child Care Center. It involved cut/fill, base course, perimeter curb, and drainage; new field lighting; a perimeter walk path around the field; and new water line for periodic washing and cleaning. | |
Square Footage: |